Crookwell 2 wind farm will utilise 46 individual wind turbines for a maximum output of 92MW. Additionally, the wind farm will require the construction of site access roads, an underground network of electrical and communication cables, an electrical substation and switchyard to connect to the national electricity grid as well as site control and facilities buildings.
Annually the wind farm is expected to produce 242 GWh, enough to power approximately 45,000 average households.